COMMERCIAL DOOR MANUFACTURING

Door packages built around the opening schedule

Fire-rated steel doors, hollow metal frames and project door packages coordinated for contractors, distributors and commercial buildings.

Blue steel door leaves staged on the Bastion Door production floor
Steel door leaves staged during factory production.
Factory productionDoor leaves, frames, cut-outs and finish preparation.
Technical coordinationSchedules, wall conditions, ratings, glazing and hardware.
Export deliveryIdentification, protected packing and container loading.
FROM SCHEDULE TO SHIPMENT

A coordinated manufacturing path

01Review openings

Sizes, handing, wall type, rating and quantity.

02Coordinate details

Frames, glazing, finish and hardware preparation.

03Produce & inspect

Manufacturing records and agreed inspection points.

04Pack & dispatch

Opening marks, grouped components and loading plan.

REAL FACTORY EVIDENCE

People, production and delivery

These photographs document factory visits, fabrication and actual export dispatch activity.

See factory capability →
Customer visitors touring the Bastion Door production floor
Customer factory visitProduction operations and project details reviewed on site.
Worker performing fabrication detail on commercial door components
Fabrication detail
Sealed export container leaving the Bastion Door factory
Export dispatch

Have a door schedule or drawing set?

Send the information already available. Missing items can be clarified during review.

Start quotation review
Scroll to Top